₹2,571.51 per Cum
Rates include GST and contractor’s profit & overheads (15%), effective 01-08-2024.
Filling of empty cavities (as shown in the structural design drawing) with quarry dust mixed with 5% cement(by volume). After initial infill of 50 mm thick with M25 concrete at base/bottom of cavities to seal off, infillwall panel cavities in 3 stages as detailed below, (i) 1st pour / infill to be limited to 0.3 to 0.50 m height from bottom of the panel. (ii) 2nd Pour/ infill: infilling shall be done only after 90 minutes interval between successive pours. Themaximum height of infill shall be restricted to 1.5m height or up to the top level of door / window. (iii) 3rd pour/infill: After an interval of 90 minutes of second pour, infill or pour the balance height up to thebottom of embedded RCC tie beam. Poure nough water just required to dampen the dry mix enough to form cake form after each stage.(cost of laying M25 concrete shall be paid separately)(If any rain falls in between any stages of concrete pour, make sure to cover the panel top to prevent ingressof water or water falling into the cavities. In case of water collection over the concrete inside the panel, drill10mm hole in GFRG panel immediately above concrete filled level to drain out water before pour/in-fill ofbalance concreting)
Build a BOQ with Ladakh SoR rates · All items in New Technologies & Materials