₹50.24 per Meter
Rates include GST and contractor’s profit & overheads (15%), effective 01-08-2024.
Filling of joints between RCC plinth beam / floor slab and wall panel of external walls, toilet / bath room / wetareas walls on all floor and parapet wall over roof slab, stair case head room at the time of erection of GFRGpanels with Grout RW/equivalent sealant compound after the erection of panel before the infill of concretein panel cavities and fine finish. This applies for all horizontal and vertical joints between GFRG wall and slabpanels.
Build a BOQ with Ladakh SoR rates · All items in New Technologies & Materials