₹16.27 per each
Rates include GST and contractor’s profit & overheads (15%), effective 01-08-2024.
Cutting ballies or wooden posts of fencing at the point of projection above the concrete or ground and stacking the same within 50 metres lead.
Build a BOQ with Ladakh SoR rates · All items in Dismentling And Demolishing