₹64.51 per Sqm
Rates include GST and contractor’s profit & overheads (15%), effective 01-08-2024.
Dismantling expanded metal or I.R.C. fabrics with necessary battens and beading including stacking the serviceable material within 50 metres lead.
Build a BOQ with Ladakh SoR rates · All items in Dismentling And Demolishing