₹574.80 per each
Rates include GST and contractor’s profit & overheads (15%), effective 01-08-2024.
Taking out C.I. cover with frame from R.C.C. top slab of manholes of various sizes including demolishing of R.C.C. work manually/ by mechanical means and stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead as per direction of Engineer-in-charge.
Build a BOQ with Ladakh SoR rates · All items in Dismentling And Demolishing