₹244.93 per Metre
Rates include GST and contractor’s profit & overheads (15%), effective 01-08-2024.
Extra for excavating trenches for pipes, cables, etc. in ordinary/hard rock exceeding 3m in depth but not exceeding 4.5 m. (Rate is over correspondingbasic item for depth upto 1.5 metre)
Build a BOQ with Ladakh SoR rates · All items in Earthwork