Ladakh SoR 2024 Item 2.19

₹4,003.34 per Sqm

Rates include GST and contractor’s profit & overheads (15%), effective 01-08-2024.

Description

Extra for planking, strutting and packing materials for cavities (in close timbering) if required to be left permanently in position. (Face area of timber permanently left to be measured).

Build a BOQ with Ladakh SoR rates · All items in Earthwork

Related items

2.4Deduct for not rolling with power roller of minimum 8 tonnes for banking excavated earth in layers not…₹5.45 / Cum2.5Deduct for not watering the excavated earth for banking₹38.78 / Cum2.11Extra for excavating trenches for pipes, cables etc. in all kinds of soil for depth exceeding 1.5 m, but not…₹144.00 / Metre2.12Extra for excavating trenches for pipes, cables, etc, in all kinds of soil for depth exceeding 3 m in depth,…₹206.00 / Metre2.14Extra for excavating trenches for pipes, cables, etc. in ordinary/hard rock exceeding 1.5 m in depth but not…₹99.27 / Metre2.15Extra for excavating trenches for pipes, cables, etc. in ordinary/hard rock exceeding 3m in depth but not…₹244.93 / Metre2.23Extra for planking and strutting in open timbering if required to be left permanently in position. (Face area…₹2,046.90 / Sqm2.25Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers…₹260.08 / Cum2.25(a)Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of…₹812.13 / Cum2.27Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and…₹2,234.22 / Cum2.31Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to…₹37.56 / Sqm2.32Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.₹7.27 / Sqm2.36Extra for levelling & neatly dressing of disposed soil completely as directed by Engineer-in-charge.₹77.47 / Cum2.37Supply and stacking of Fly ash conforming to IRC- 58 at site, including carriage, loading , unloading &…₹263.61 / Cum2.38Filling with available fly ash and earth (excluding rock) in trenches or embankment in layers (each layer…₹255.23 / Cum