₹260.08 per Cum
Rates include GST and contractor’s profit & overheads (15%), effective 01-08-2024.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Build a BOQ with Ladakh SoR rates · All items in Earthwork