Ladakh SoR 2024 Item 2.38

₹255.23 per Cum

Rates include GST and contractor’s profit & overheads (15%), effective 01-08-2024.

Description

Filling with available fly ash and earth (excluding rock) in trenches or embankment in layers (each layer should not exceed 15 cm), with intermediate layer of compacted earth (Soil density of 98%) after every four layers of compacted depth of fly ash, sides & top layer of filling shall be done with earth having total minimum compacted thickness 30 cm or as decided by Engineer - in-charge, including compacting each layer by rolling/ ramming and watering, all complete as per drawing and direction of Engineer -in - charge.

Build a BOQ with Ladakh SoR rates · All items in Earthwork

Related items

2.4Deduct for not rolling with power roller of minimum 8 tonnes for banking excavated earth in layers not…₹5.45 / Cum2.5Deduct for not watering the excavated earth for banking₹38.78 / Cum2.11Extra for excavating trenches for pipes, cables etc. in all kinds of soil for depth exceeding 1.5 m, but not…₹144.00 / Metre2.12Extra for excavating trenches for pipes, cables, etc, in all kinds of soil for depth exceeding 3 m in depth,…₹206.00 / Metre2.14Extra for excavating trenches for pipes, cables, etc. in ordinary/hard rock exceeding 1.5 m in depth but not…₹99.27 / Metre2.15Extra for excavating trenches for pipes, cables, etc. in ordinary/hard rock exceeding 3m in depth but not…₹244.93 / Metre2.19Extra for planking, strutting and packing materials for cavities (in close timbering) if required to be left…₹4,003.34 / Sqm2.23Extra for planking and strutting in open timbering if required to be left permanently in position. (Face area…₹2,046.90 / Sqm2.25Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers…₹260.08 / Cum2.25(a)Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of…₹812.13 / Cum2.27Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and…₹2,234.22 / Cum2.31Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to…₹37.56 / Sqm2.32Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.₹7.27 / Sqm2.36Extra for levelling & neatly dressing of disposed soil completely as directed by Engineer-in-charge.₹77.47 / Cum2.37Supply and stacking of Fly ash conforming to IRC- 58 at site, including carriage, loading , unloading &…₹263.61 / Cum